Renovated this master bathroom for a previous customer! Installed new Marazzi Glazed 12" x 24" Cavatina Aria Porcelain tile to the floor and shower walls in a 1/3-2/3 pattern. Installed new Anatolia Harmony Warm Blend Flat Pebble Mosaic shower floor tile to the shower floor...

Gutted this master bathroom to the studs! Replaced some floor joists and bad/rotten sub-floor. Moved the toilet from one corner to the opposite corner in the room, thus moved the vanity sink locations and allowed a larger double vanity with tower cabinets on each end....

Gutted this master bathroom to the studs. Converted the old fiberglass tub/shower to a master shower with a bench seat! Eliminated the linen closet and converted the single vanity to a double vanity with pullouts on each end! Converted the skylight to a Solatube to...

Gutted this master bathroom! Converted the tub to a large shower with bench seat and converted the shower to a linen cabinet. Scraped the ceiling and repaired the sheetrock walls where wallpaper had not been removed properly! Installed new Atlas Concorde Ridge 12" x 24"...

Gutted this hall bathroom to the studs! Moved the tub/shower plumbing to the opposite wall and installed a 4' tub. Eliminated the linen closet on the right side of the bathroom as well as the hall closet behind it, so as to move the toilet...

Remodeled this master bathroom! Installed new Medallion vanity cabinets, Cambria Quartz coutertops, tub deck, window seat, knee wall caps, and shower seat! Installed a Jucuzzi air tub, Delta faucets, 12x 24 porcelain wall tile, stained glass tile, matching tub skirt, new mirrors, porcelain under-mount sinks,...

Gutted this master bathroom, except for the Cambria Quartz countertop on the vanity, which was the inspiration for the remodel! We used 2cm Cambria Quartz Praa Sands material for the walls of the new shower! We made the shower handicap accessible by eliminating the curb/threshold,...

Remodeled this master bathroom! Removed all the sheetrock from the walls, and added insulation! Removed the knee wall from the end of the vanity. Scraped the ceilings and installed new 1/2" sheetrock. Removed the carpet and existing tile. Installed Milestone 8" x 48" Mood Wood...

Gutted this large master bathroom. Converted the walls of the shower to knee/pony walls, thus opening this bathroom up. Moved both vanity sinks to the center of each vanity. Moved the vanity lights to the center as well. Moved the shower valve, diverter valve, and...

Gutted this master bathroom! The closet area was reconfigured which doubled the storage capacity by building new walls that separated the space from the bathroom. The closet was customized by Brad Davidson from Incognito Custom Closets. We installed a new 3' x 6'8" full view...